GCS Cabin news Post



3 x changing rooms     28-06-2018

 plasticol cabin changing room 3 new changing rooms supplied to a tennis club in Birmingham. The cabins are linked together through central apetures with lockable internal doors forming male female and junior changing rooms.



Double stack in Barnsley     28-06-2018

An existing cabin was present on site which was to remain in use. We took measurements and built 3 new cabins to enable us to double stack and maximise the space on site. The set up consisted of toilet,canteen,meeting room and offices.



Long Eaton Utd. FC Acadamy     28-06-2018

A 4 bay modular classroom was built new for the acadamy. The bays were transported to site on flat bed lorries and installed using a crane to position the classroom. The whole process was completed in under 2 days.